Cleaned device externals
Cleared stored ePHI
Visual Inspection; Passed
AM12 Condition; Good (S/N:______124180001367______)
Battery Date Code = ___2025____
Battery Test - No Load - (> 12.5VDC) = ___12.88____VDC
Battery Test - 10Ω25W - (>11.7VDC) after 10 sec = ___12.53____VDC
Current Test - Power OFF - (< 250uA) = ____134.56___uA
Current Test - Power ON - (< 1.1A) = ___0.678____A
Current Test - Charging voltage (13.0 - 14.7 VDC) = ___13.76____VDC
Touchscreen Calibrated
Date/Time; Updated
Auto Test; Passed
Writer Test; Passed
Printhead in good condition, cleaned, Que verified
Performance Tested EKG Leads @ 30, 60, 80, 120 BPM; Passed
Lead-off Warning; Verified
Noise Test; Passed
Electrical Safety Test; Passed
Enclosure Leakage Current measured >300µA; Passed
Patient Leakage Current measured >10µA; Passed
PM Completed
🔍Technician Findings
Was able to duplicate issue. Unit's cables were fine and working correctly, but the alligator clips were bad and not getting a solid connections, causing intermediate loss of connections.
⚠️Problem Description
Follow up to WO-01311164
Inspected EKG machine and found it in working order.Hooked up the SlimTrax and simulated an EKG with no problems or artifacts.Staff said ekg fails intermittently.EKG cables were replaced a month before.Derek at Level 2 said to set up a loaner.Staff wants a loaner because issues are intermittent and they only have one unit on the facility
Burdick - ELI 280
Asset ID: 13115504
S/N: 124170000652 https://www.ebiotrack.com/workorder.php?wo=70410
📄Description
ECG, BURDICK 280 INTERP 200 ECG STORAGE AM12/USB/LAN
Oak Street Health’s Consigned Inventory
Timeline
📞
Case Linked Nov 11, 5:27 PM
Case Number:00543088
Subject:Follow up to WO-01311164
Status:Closed
🚨23.0 business days
📋
▶
2
Work Order Created Dec 16, 1:03 PM
Work Order Created → Status: Assigned
👷
Status: Assigned by Samuel Klein
From:Tech On Site
To:Assigned
Duration in Previous:0m
🔧
Status: Tech On Site by Samuel KleinDec 16, 1:13 PM
From:Assigned
To:Tech On Site
Duration in Previous:9m
🔩
4x Parts Added Dec 16, 2:25 PM
Type:Parts, Labor
Status:Open
Qty:1
✔️
Status: Completed by Samuel KleinDec 16, 3:04 PM
From:Tech On Site, Completed
To:Completed, Closed
Duration in Previous:1h 51m, 0m
⏳2.0 business days
📄
Status: Ready to Bill by Diane PattonDec 17, 5:28 PM
From:Closed
To:Ready to Bill
Duration in Previous:1d 2h
🚨10.8 business days
📨
Status: Invoice Pending by Diane PattonJan 2, 6:11 PM
From:Ready to Bill
To:Invoice Pending
Duration in Previous:16d 0h
🧾
▶
2
Invoice Created Jan 2, 6:30 PM
Invoice Created → Status: Invoiced
💰
Status: Invoiced by Diane Patton
From:Invoice Pending
To:Invoiced
Duration in Previous:19m
Bottlenecks
Closed
Duration: 1.5 business days (threshold: 1.0 business days)
Exceeded by 3.9 business hours
Ready to Bill
Duration: 10.2 business days (threshold: 1.0 business days)