Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Jan 31, 2026
✓ SLA Met (17 biz days early)
🕐 Clock stopped: Completed (Jan 6, 2026)
▶ Clock Running
Status: Created
Dec 17 → Dec 17, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Dec 17 → Dec 17, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Assigned
Dec 17 → Dec 18, 2025
1 business day (counted)
Running total: 1 of ? biz days used
10d
▶ Clock Running
Status: Scheduled
Dec 18 → Jan 5, 2026
10 business days (counted)
Running total: 11 of ? biz days used
▶ Clock Running
Status: Tech On Site
Jan 5 → Jan 6, 2026
1 business day (counted)
Running total: 12 of ? biz days used
▶ Clock Running
Status: Scheduled
Jan 6 → Jan 6, 2026
0 business days (counted)
Running total: 12 of ? biz days used
Created: Dec 17, 2025
Completed: Jan 6, 2026
Show SLA Clock Detail (6 periods)
Period
Status
Clock
Biz Days
Running Total
Dec 17 → Dec 17
Created
▶ Running
0
0
Dec 17 → Dec 17
Ready for Scheduling
▶ Running
0
0
Dec 17 → Dec 18
Assigned
▶ Running
1
1
Dec 18 → Jan 5
Scheduled
▶ Running
10
11
Jan 5 → Jan 6
Tech On Site
▶ Running
1
12
Jan 6 → Jan 6
Scheduled
▶ Running
0
12
Coordinators
12.6 days
Over SLA
Field Work
4.0 days
Over SLA
Billing
12.3 days
Over SLA
Created: Dec 17, 2025
Due: Jan 31, 2026
Completed: Jan 9, 2026 (22 days early)
⏱️
12.3d in Ready to Bill
Longest Stage
🔄
9 transitions
Status Changes
⚠️
23.4d over
Total Delay
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00552387
6008270744
Closed
15K
SYS-LC-1260IIE
Contract ends 07/31/2026 repair included
PM / EOQ
PM + OQ - Most of the time the lamp will be replaced unless the current lamp was just installed or has low accumulated hours. Always have techs order a lamp if they have an OQ with the PM.
G7111B
DEAEV02276 1260 Infinity II Quaternary Pump
G7121A
DEAE303717 1260 Infinity II Fluorescence Detector
G7114A
DEACX20740 1260 Infinity II VW Detector
G7129A
DEAEQ37980 1260 Infinity II Vialsampler
G7116A
DEAEM07001 1260 Infinity II Multicolumn Thermostat
Contact
Diana Hernandez Guerrero
🚨
Primary Delay
12.3 days stuck in "Ready to Bill"
⏱️
Total Delay
23.4 business days over SLA thresholds
SLA vs Actual Time by Status
Scheduled
10.6d
/ 2.0d SLA
Tech On Site
1.0d
/ 1.0d SLA
Completed
3.1d
/ 1.0d SLA
Ready to Bill
12.3d
/ 1.0d SLA
Invoice Pending
0.0d
/ 2.0d SLA
💬 Activities, Notes & Communications
📝 WO Notes (6)
📅 Events (1)
🔒
Internal CSA Notes
Please assign to Jared Rappaport ARP to site is 17 miles. Zone 1
01-05-2026 JR WO will be closed upon completion of the associated EOQ WO-01326974, per Agilent practices.
🔧
Work Performed
PM completed as per Agilent ACE protocol Amgen_B25-QC-Lab_EQP_LC.
🔍
Technician Findings
All parts replaced with like for like. All required tests passed Agilent specifications.
⚠️
Problem Description
15K
SYS-LC-1260IIE
Contract ends 07/31/2026 repair included
PM / EOQ
PM + OQ - Most of the time the lamp will be replaced unless the current lamp was just installed or has low accumulated hours. Always have techs order a lamp if they have an OQ with the PM.
G7111B
DEAEV02276 1260 Infinity II Quaternary Pump
G7121A
DEAE303717 1260 Infinity II Fluorescence Detector
G7114A
DEACX20740 1260 Infinity II VW Detector
G7129A
DEAEQ37980 1260 Infinity II Vialsampler
G7116A
DEAEM07001 1260 Infinity II Multicolumn Thermostat
📄
Description
1260 Infinity II Quaternary Pump
📞
Call Description
JAN 2025 LC PM
📅
WO-01326973 - Preventive Maintenance - G7111B - Thousand Oaks - Amgen Inc
Jan 5, 2026 11:00am – 7:00pm
Work Order: WO-01326973
Account: AGILENT TECHNOLOGIES (ASP)
Customer Case Number: 6008270744
Location: Amgen Inc
Address: 1 Amgen Center Dr, Thousand Oaks, CA 91320
Manufacturer:
Model #: G7111B
Serial #: DEAEV02276
Contact Name: Diana Hernandez Guerrero
Contact Phone: 8055149618
Contact Email: dhe
Timeline
📞
Case Number:
00552387
Subject:
6008270744
Status:
Closed
📋
📅
From:
Entered, Ready for Scheduling
To:
Ready for Scheduling, Assigned
Duration in Previous:
0m
👷
Technician:
Jared Rappaport
🗓️
📅
Scheduled For:
2026-01-05T16:00:00.000+0000
🔧
⏱️
Type:
Labor, Travel
Status:
Open
Qty:
0.5, 17
🔩
⏱️
Type:
Labor
Status:
Open
Qty:
4.5, 3
🗓️
From:
Tech On Site
To:
Scheduled
Duration in Previous:
7h 39m
⏱️
✔️
From:
Scheduled
To:
Completed
Duration in Previous:
36m
🏁
From:
Completed
To:
Closed
Duration in Previous:
2d 23h
📄
From:
Closed
To:
Ready to Bill
Duration in Previous:
21h 3m
📨
💰
From:
Invoice Pending
To:
Invoiced
Duration in Previous:
1m
🧾
Invoice Number:
SM-252436
Bottlenecks
Assigned
Duration: 2.0 business days (threshold: 4.0 business hours)
Exceeded by 1.5 business days
Scheduled
Duration: 10.5 business days (threshold: 2.0 business days)
Exceeded by 8.5 business days
Completed
Duration: 3.1 business days (threshold: 1.0 business days)
Exceeded by 2.1 business days
Ready to Bill
Duration: 12.3 business days (threshold: 1.0 business days)
Exceeded by 11.3 business days
ℹ️ Work Order Details
Type
Preventive Maintenance
Technician
Jared Rappaport
Scheduled
Jan 5, 11:00 AM
Work Details (11)
Name
Type
Status
Qty
Amount
Date
WL-03053539
Labor
Open
0.5
$0.00
Jan 5, 11:41 AM
WL-03053540
Travel
Open
17
$0.00
Jan 5, 11:41 AM
WL-03054160
Parts
Open
1
$0.00
Jan 5, 7:17 PM
WL-03054162
Parts
Open
2
$0.00
Jan 5, 7:17 PM
WL-03054161
Parts
Open
1
$0.00
Jan 5, 7:17 PM
WL-03054164
Parts
Open
1
$0.00
Jan 5, 7:17 PM
WL-03054163
Parts
Open
1
$0.00
Jan 5, 7:17 PM
WL-03054168
Labor
Open
4.5
$0.00
Jan 5, 7:19 PM
WL-03054167
Labor
Open
3
$585.00
Jan 5, 7:19 PM
WL-03054237
Labor
Open
0.5
$0.00
Jan 5, 7:54 PM
WL-03054238
Travel
Open
17
$0.00
Jan 5, 7:54 PM