Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Jan 31, 2026
✓ SLA Met (14 biz days early)
🕐 Clock stopped: Completed (Jan 9, 2026)
▶ Clock Running
Status: Created
Dec 17 → Dec 17, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Dec 17 → Dec 17, 2025
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Assigned
Dec 17 → Dec 18, 2025
1 business day (counted)
Running total: 1 of ? biz days used
11d
▶ Clock Running
Status: Scheduled
Dec 18 → Jan 6, 2026
11 business days (counted)
Running total: 12 of ? biz days used
▶ Clock Running
Status: Tech On Site
Jan 6 → Jan 7, 2026
1 business day (counted)
Running total: 13 of ? biz days used
▶ Clock Running
Status: Tech Off Site
Jan 7 → Jan 8, 2026
1 business day (counted)
Running total: 14 of ? biz days used
▶ Clock Running
Status: Tech On Site
Jan 8 → Jan 9, 2026
1 business day (counted)
Running total: 15 of ? biz days used
Created: Dec 17, 2025
Completed: Jan 9, 2026
Show SLA Clock Detail (7 periods)
Period
Status
Clock
Biz Days
Running Total
Dec 17 → Dec 17
Created
▶ Running
0
0
Dec 17 → Dec 17
Ready for Scheduling
▶ Running
0
0
Dec 17 → Dec 18
Assigned
▶ Running
1
1
Dec 18 → Jan 6
Scheduled
▶ Running
11
12
Jan 6 → Jan 7
Tech On Site
▶ Running
1
13
Jan 7 → Jan 8
Tech Off Site
▶ Running
1
14
Jan 8 → Jan 9
Tech On Site
▶ Running
1
15
Coordinators
13.5 days
Over SLA
Field Work
3.1 days
Over SLA
Billing
13.4 days
Over SLA
Created: Dec 17, 2025
Due: Jan 31, 2026
Completed: Jan 9, 2026 (22 days early)
⏱️
11.5d in Scheduled
Longest Stage
🔄
12 transitions
Status Changes
⚠️
20.6d over
Total Delay
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
🚩
3 On-Site Visits
3 on-site visits — why were multiple trips needed?
👤 Self-scheduled by Jared Rappaport — scheduling delays attributed to technician, not coordinators
Visit 1
Jan 6, 2026
Visit 2
Jan 7, 2026
Visit 3
Jan 8, 2026
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00552387
6008270744
Closed
15K
SYS-LC-1260IIE
Contract ends 07/31/2026 repair included
PM / EOQ
PM + OQ - Most of the time the lamp will be replaced unless the current lamp was just installed or has low accumulated hours. Always have techs order a lamp if they have an OQ with the PM.
G7111B
DEAEV02276 1260 Infinity II Quaternary Pump
G7121A
DEAE303717 1260 Infinity II Fluorescence Detector
G7114A
DEACX20740 1260 Infinity II VW Detector
G7129A
DEAEQ37980 1260 Infinity II Vialsampler
G7116A
DEAEM07001 1260 Infinity II Multicolumn Thermostat
Contact
Diana Hernandez Guerrero
🚨
Primary Delay
11.5 days stuck in "Scheduled"
⏱️
Total Delay
20.6 business days over SLA thresholds
SLA vs Actual Time by Status
Scheduled
11.5d
/ 2.0d SLA
Tech On Site
1.9d
/ 1.0d SLA
Tech Off Site
1.2d
/ 2.0d SLA
Completed
0.1d
/ 1.0d SLA
Ready to Bill
10.7d
/ 1.0d SLA
Billing Review
2.6d
/ 2.0d SLA
Invoice Pending
0.0d
/ 2.0d SLA
💬 Activities, Notes & Communications
📝 WO Notes (6)
📅 Events (1)
🔒
Internal CSA Notes
1.12.26 Ycampos - Placing WO in BR per tech Nicholas Willick to update hours.
Please assign to Jared Rappaport ARP to site is 17 miles. Zone 1
🔧
Work Performed
Agilent HPLC EOQ completed per signed EQP: Amgen_B25 QC Lab_EQP_LC. All tests passed protocol specifications.
🔍
Technician Findings
All required tests passed protocol specifications.
⚠️
Problem Description
15K
SYS-LC-1260IIE
Contract ends 07/31/2026 repair included
PM / EOQ
PM + OQ - Most of the time the lamp will be replaced unless the current lamp was just installed or has low accumulated hours. Always have techs order a lamp if they have an OQ with the PM.
G7111B
DEAEV02276 1260 Infinity II Quaternary Pump
G7121A
DEAE303717 1260 Infinity II Fluorescence Detector
G7114A
DEACX20740 1260 Infinity II VW Detector
G7129A
DEAEQ37980 1260 Infinity II Vialsampler
G7116A
DEAEM07001 1260 Infinity II Multicolumn Thermostat
📄
Description
1260 Infinity II Quaternary Pump
📞
Call Description
JAN 2025 LC EOQ
📅
WO-01326974 - EOQ - G7111B - Thousand Oaks - Amgen Inc
Jan 6, 2026 11:00am – 8:00pm
Work Order: WO-01326974
Account: AGILENT TECHNOLOGIES (ASP)
Customer Case Number: 6008270744
Location: Amgen Inc
Address: 1 Amgen Center Dr, Thousand Oaks, CA 91320
Manufacturer:
Model #: G7111B
Serial #: DEAEV02276
Contact Name: Diana Hernandez Guerrero
Contact Phone: 8055149618
Contact Email: dhe
Timeline
📞
Case Number:
00552387
Subject:
6008270744
Status:
Closed
📋
📅
From:
Entered, Ready for Scheduling
To:
Ready for Scheduling, Assigned
Duration in Previous:
0m
👷
Technician:
Jared Rappaport
🗓️
📅
Scheduled For:
2026-01-06T16:00:00.000+0000
🔧
From:
Scheduled
To:
Tech On Site
Duration in Previous:
18d 23h
⏱️
🚗
From:
Tech On Site
To:
Tech Off Site
Duration in Previous:
5h 24m
⏱️
Type:
Labor, Travel
Status:
Open
Qty:
0.58333333333333, 17
⏱️
Type:
Labor, Travel
Status:
Open
Qty:
0.5, 17
🔧
⏱️
Type:
Labor
Status:
Open
Qty:
3, 5
⏱️
Type:
Labor, Travel
Status:
Open
Qty:
0.75, 17
⏱️
Type:
Labor, Travel
Status:
Open
Qty:
0.58333333333333, 17
⏱️
Type:
Labor
Status:
Open
Qty:
4, 4.5
✔️
From:
Tech On Site
To:
Completed
Duration in Previous:
1d 0h
⏱️
🏁
From:
Completed
To:
Closed
Duration in Previous:
49m
📄
From:
Closed
To:
Ready to Bill
Duration in Previous:
19h 16m
💵
From:
Ready to Bill
To:
Billing Review
Duration in Previous:
2d 21h
📄
From:
Billing Review
To:
Ready to Bill
Duration in Previous:
2d 1h
📨
🧾
Invoice Number:
SM-252436
💰
From:
Invoice Pending
To:
Invoiced
Duration in Previous:
1m
Bottlenecks
Assigned
Duration: 2.0 business days (threshold: 4.0 business hours)
Exceeded by 1.5 business days
Scheduled
Duration: 11.5 business days (threshold: 2.0 business days)
Exceeded by 9.5 business days
Tech On Site
Duration: 1.2 business days (threshold: 1.0 business days)
Exceeded by 1.4 business hours
Ready to Bill
Duration: 1.3 business days (threshold: 1.0 business days)
Exceeded by 2.5 business hours
Billing Review
Duration: 2.6 business days (threshold: 2.0 business days)
Exceeded by 4.9 business hours
Ready to Bill
Duration: 9.4 business days (threshold: 1.0 business days)
Exceeded by 8.4 business days
ℹ️ Work Order Details
Technician
Jared Rappaport
Scheduled
Jan 6, 11:00 AM
Work Details (15)
Name
Type
Status
Qty
Amount
Date
WL-03055518
Labor
Open
5
$0.00
Jan 6, 7:38 PM
WL-03055622
Labor
Open
0.58333333333333
$0.00
Jan 6, 8:46 PM
WL-03055623
Travel
Open
17
$0.00
Jan 6, 8:46 PM
WL-03056117
Labor
Open
0.5
$0.00
Jan 7, 11:42 AM
WL-03056118
Travel
Open
17
$0.00
Jan 7, 11:42 AM
WL-03057030
Labor
Open
3
$1,040.00
Jan 7, 8:20 PM
WL-03057031
Labor
Open
5
$0.00
Jan 7, 8:20 PM
WL-03057155
Labor
Open
0.75
$0.00
Jan 7, 10:15 PM
WL-03057156
Travel
Open
17
$0.00
Jan 7, 10:15 PM
WL-03057437
Labor
Open
0.58333333333333
$0.00
Jan 8, 11:28 AM
WL-03057438
Travel
Open
17
$0.00
Jan 8, 11:28 AM
WL-03058460
Labor
Open
4
$0.00
Jan 8, 8:16 PM
WL-03058461
Labor
Open
4.5
$0.00
Jan 8, 8:16 PM
WL-03058612
Labor
Open
0.91666666666667
$0.00
Jan 8, 9:15 PM
WL-03058613
Travel
Open
17
$0.00
Jan 8, 9:15 PM