Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Mar 31, 2026
✓ SLA Met (23 biz days early)
🕐 Clock stopped: Completed (Feb 26, 2026)
▶ Clock Running
Status: Created
Jan 19 → Jan 19, 2026
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Jan 19 → Jan 19, 2026
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Assigned
Jan 19 → Jan 21, 2026
2 business days (counted)
Running total: 2 of ? biz days used
25d
▶ Clock Running
Status: Scheduled
Jan 21 → Feb 26, 2026
25 business days (counted)
Running total: 27 of ? biz days used
▶ Clock Running
Status: Tech On Site
Feb 26 → Feb 26, 2026
0 business days (counted)
Running total: 27 of ? biz days used
Created: Jan 19, 2026
Completed: Feb 26, 2026
Show SLA Clock Detail (5 periods)
Period
Status
Clock
Biz Days
Running Total
Jan 19 → Jan 19
Created
▶ Running
0
0
Jan 19 → Jan 19
Ready for Scheduling
▶ Running
0
0
Jan 19 → Jan 21
Assigned
▶ Running
2
2
Jan 21 → Feb 26
Scheduled
▶ Running
25
27
Feb 26 → Feb 26
Tech On Site
▶ Running
0
27
Coordinators
27.9 days
Over SLA
Created: Jan 19, 2026
Due: Mar 31, 2026 (26 days left)
⏱️
25.9d in Scheduled
Longest Stage
🔄
6 transitions
Status Changes
⚠️
25.4d over
Total Delay
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00560134
6008321164
Closed
38R
SYS-LC-1260-E
Contract ends 12/31/2026 repair included
PMPLUS
G1312B
DEACB02545 1260 Binary Pump
G1316A
DEACN33281 1260 Thermostatted Column Compartment
G1329B
DEAAC31023 1260 Standard Autosampler
G1315D
DEAAX06750 1260 Diode Array Detector VL
G1322A
JPAAL84129 1260 Standard Degasser
G1321C
DEABV00562 1260 Infinity Fluorescence Detector
G1330B
DEBAK17475 1290 Thermostat
🚨
Primary Delay
25.9 days stuck in "Scheduled"
⏱️
Total Delay
25.4 business days over SLA thresholds
SLA vs Actual Time by Status
Scheduled
25.9d
/ 2.0d SLA
Tech On Site
1.0d
/ 1.0d SLA
Completed
0.0d
/ 1.0d SLA
💬 Activities, Notes & Communications
📝 WO Notes (5)
📋 Tasks (1)
📅 Events (1)
🔒
Internal CSA Notes
21 Jan 2026 Larry Alberty
Reached out for scheduling.
Please assign to Larry Alberty ARP to site is 13 miles. Zone 1
🔧
Work Performed
completed PM
⚠️
Problem Description
38R
SYS-LC-1260-E
Contract ends 12/31/2026 repair included
PMPLUS
PM Plus - allows a lamp to be ordered and consumed on a PM if needed. Sometimes a lamp may have been installed recently, so a new lamp is not needed at time of PM. The tech needs to ask the customer these questions when scheduling the PM for a PM PLUS. PM PLUS = UV lamp is included in the service.
G1312B
DEACB02545 1260 Binary Pump
G1316A
DEACN33281 1260 Thermostatted Column Compartment
G1329B
DEAAC31023 1260 Standard Autosampler
G1315D
DEAAX06750 1260 Diode Array Detector VL
G1322A
JPAAL84129 1260 Standard Degasser
G1321C
DEABV00562 1260 Infinity Fluorescence Detector
G1330B
DEBAK17475 1290 Thermostat
📄
Description
1260 Binary Pump
📞
Call Description
MAR 2026 LC PMPLUS
📞
Call
Completed
Jan 21, 2026
21 Jan 2026 Larry Alberty
Reached out for scheduling.
📅
WO-01338431 - Preventive Maintenance - G1312B - Pleasanton - Thermo Fisher Scientific Inc
Feb 26, 2026 9:00am – 5:00pm
Work Order: WO-01338431
Account: AGILENT TECHNOLOGIES (ASP)
Customer Case Number: 6008321164
Location: Thermo Fisher Scientific Inc
Address: 6055 Sunol Blvd., Pleasanton, CA 94566
Manufacturer: Agilent Technologies
Model #: G1312B
Serial #: DEACB02545
Contact Name: Dwen Chu
Contact Phone: 9257191764
Timeline
📞
Case Number:
00560134
Subject:
6008321164
Status:
Closed
📋
📅
From:
Entered, Ready for Scheduling
To:
Ready for Scheduling, Assigned
Duration in Previous:
2m, 0m
👷
Technician:
Larry Alberty
🗓️
📅
Scheduled For:
2026-02-26T14:00:00.000+0000
🔧
From:
Scheduled
To:
Tech On Site
Duration in Previous:
35d 22h
✔️
⏱️
Type:
Labor, Travel, Parts
Status:
Open
Qty:
1, 6, 15
🏁
From:
Completed
To:
Closed
Duration in Previous:
4m
📄
From:
Closed
To:
Ready to Bill
Duration in Previous:
6h 59m
Bottlenecks
Assigned
Duration: 2.0 business days (threshold: 4.0 business hours)
Exceeded by 1.5 business days
Scheduled
Duration: 25.9 business days (threshold: 2.0 business days)
Exceeded by 23.9 business days
ℹ️ Work Order Details
Type
Preventive Maintenance
Scheduled
Feb 26, 9:00 AM
Work Details (8)
Name
Type
Status
Qty
Amount
Date
WL-03121995
Labor
Open
1
$0.00
Feb 26, 6:14 PM
WL-03121996
Labor
Open
6
$513.00
Feb 26, 6:14 PM
WL-03121997
Labor
Open
1
$0.00
Feb 26, 6:14 PM
WL-03121998
Travel
Open
15
$180.00
Feb 26, 6:14 PM
WL-03121999
Travel
Open
15
$0.00
Feb 26, 6:14 PM
WL-03122000
Parts
Open
1
$0.00
Feb 26, 6:14 PM
WL-03122001
Parts
Open
1
$0.00
Feb 26, 6:14 PM
WL-03122002
Parts
Open
1
$0.00
Feb 26, 6:14 PM