Work Order 360 View
Detailed work order timeline, KPIs, and analysis
PC
SLA Clock
Per client agreement · Target: Mar 31, 2026
✓ SLA Met (22 biz days early)
🕐 Clock stopped: Completed (Feb 27, 2026)
▶ Clock Running
Status: Created
Jan 19 → Jan 19, 2026
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Ready for Scheduling
Jan 19 → Jan 19, 2026
0 business days (counted)
Running total: 0 of ? biz days used
▶ Clock Running
Status: Assigned
Jan 19 → Jan 21, 2026
2 business days (counted)
Running total: 2 of ? biz days used
26d
▶ Clock Running
Status: Scheduled
Jan 21 → Feb 27, 2026
26 business days (counted)
Running total: 28 of ? biz days used
▶ Clock Running
Status: Tech On Site
Feb 27 → Feb 27, 2026
0 business days (counted)
Running total: 28 of ? biz days used
Created: Jan 19, 2026
Completed: Feb 27, 2026
Show SLA Clock Detail (5 periods)
Period
Status
Clock
Biz Days
Running Total
Jan 19 → Jan 19
Created
▶ Running
0
0
Jan 19 → Jan 19
Ready for Scheduling
▶ Running
0
0
Jan 19 → Jan 21
Assigned
▶ Running
2
2
Jan 21 → Feb 27
Scheduled
▶ Running
26
28
Feb 27 → Feb 27
Tech On Site
▶ Running
0
28
Coordinators
28.9 days
Over SLA
Created: Jan 19, 2026
Due: Mar 31, 2026 (26 days left)
⏱️
26.9d in Scheduled
Longest Stage
🔄
5 transitions
Status Changes
⚠️
27.2d over
Total Delay
📦
0 orders, 0 quotes
Parts & Quotes
👤
Self-Scheduled
Scheduling
AI Analysis
Powered by OpenAI
Generating AI analysis...
🎫
Case #00560134
6008321164
Closed
38R
SYS-LC-1260-E
Contract ends 12/31/2026 repair included
PMPLUS
G1312B
DEACB02545 1260 Binary Pump
G1316A
DEACN33281 1260 Thermostatted Column Compartment
G1329B
DEAAC31023 1260 Standard Autosampler
G1315D
DEAAX06750 1260 Diode Array Detector VL
G1322A
JPAAL84129 1260 Standard Degasser
G1321C
DEABV00562 1260 Infinity Fluorescence Detector
G1330B
DEBAK17475 1290 Thermostat
🚨
Primary Delay
26.9 days stuck in "Scheduled"
⏱️
Total Delay
27.2 business days over SLA thresholds
SLA vs Actual Time by Status
Scheduled
26.9d
/ 2.0d SLA
Tech On Site
1.0d
/ 1.0d SLA
💬 Activities, Notes & Communications
📝 WO Notes (5)
📋 Tasks (1)
📅 Events (1)
🔒
Internal CSA Notes
21 Jan 2026 Larry Alberty
Reached out for scheduling.
Please assign to Larry Alberty ARP to site is 13 miles. Zone 1
🔧
Work Performed
Completed LC EOQ.
⚠️
Problem Description
38R
SYS-LC-1260-E
Contract ends 12/31/2026 repair included
PMPLUS
PM Plus - allows a lamp to be ordered and consumed on a PM if needed. Sometimes a lamp may have been installed recently, so a new lamp is not needed at time of PM. The tech needs to ask the customer these questions when scheduling the PM for a PM PLUS. PM PLUS = UV lamp is included in the service.
G1312B
DEACB02545 1260 Binary Pump
G1316A
DEACN33281 1260 Thermostatted Column Compartment
G1329B
DEAAC31023 1260 Standard Autosampler
G1315D
DEAAX06750 1260 Diode Array Detector VL
G1322A
JPAAL84129 1260 Standard Degasser
G1321C
DEABV00562 1260 Infinity Fluorescence Detector
G1330B
DEBAK17475 1290 Thermostat
📄
Description
1260 Binary Pump
📞
Call Description
MAR 2026 LC EOQ
📞
Call
Completed
Jan 21, 2026
21 Jan 2026 Larry Alberty
Reached out for scheduling.
📅
WO-01338433 - EOQ - G1312B - Pleasanton - Thermo Fisher Scientific Inc
Feb 27, 2026 8:00am – 4:00pm
Work Order: WO-01338433
Account: AGILENT TECHNOLOGIES (ASP)
Customer Case Number: 6008321164
Location: Thermo Fisher Scientific Inc
Address: 6055 Sunol Blvd., Pleasanton, CA 94566
Manufacturer: Agilent Technologies
Model #: G1312B
Serial #: DEACB02545
Contact Name: Dwen Chu
Contact Phone: 9257191764
Timeline
📞
Case Number:
00560134
Subject:
6008321164
Status:
Closed
📋
📅
From:
Entered, Ready for Scheduling
To:
Ready for Scheduling, Assigned
Duration in Previous:
0m
👷
Technician:
Larry Alberty
🗓️
📅
Scheduled For:
2026-02-27T13:00:00.000+0000
🔧
From:
Scheduled
To:
Tech On Site
Duration in Previous:
36d 20h
⏱️
Type:
Labor, Travel
Status:
Open
Qty:
1, 6, 15
✔️
From:
Tech On Site, Completed
To:
Completed, Closed
Duration in Previous:
9h 56m, 0m
📄
From:
Closed
To:
Ready to Bill
Duration in Previous:
3d 6h
Bottlenecks
Assigned
Duration: 2.0 business days (threshold: 4.0 business hours)
Exceeded by 1.5 business days
Scheduled
Duration: 26.9 business days (threshold: 2.0 business days)
Exceeded by 24.9 business days
Closed
Duration: 1.8 business days (threshold: 1.0 business days)
Exceeded by 6.7 business hours
ℹ️ Work Order Details
Scheduled
Feb 27, 8:00 AM
Work Details (5)
Name
Type
Status
Qty
Amount
Date
WL-03123503
Labor
Open
1
$0.00
Feb 27, 2:03 PM
WL-03123504
Labor
Open
6
$912.00
Feb 27, 2:03 PM
WL-03123505
Labor
Open
1
$0.00
Feb 27, 2:03 PM
WL-03123506
Travel
Open
15
$180.00
Feb 27, 2:03 PM
WL-03123507
Travel
Open
15
$0.00
Feb 27, 2:03 PM