Work Order 360 View

Detailed work order timeline, KPIs, and analysis

← WO Overview

WO-01315577 ↗ ServiceMax

DIVISION OF FORENSIC SCIENCES • Repair • P7

📍 Division of Forensic Sciences - Adams St. — 200 South Adams St., Wilmington DE, 19809

Nov 17, 2025 → Present

🔴 Behind
P7
SLA Clock
7 business days from creation · Target: Nov 26, 2025
✗ SLA Missed (3 biz days late)
Active: 10 biz days
Paused: 58 biz days
Budget: 7 biz days
🕐 Clock stopped: Completed (Feb 27, 2026)
SLA Target
▶ Clock Running
Status: Created
Nov 17 → Nov 17, 2025
0 business days (counted)
Running total: 0 of 7 biz days used
▶ Clock Running
Status: L2 Screening
Nov 17 → Nov 18, 2025
1 business day (counted)
Running total: 1 of 7 biz days used
⏸58d
⏸ Clock Paused
Status: Awaiting Parts
Nov 18 → Feb 16, 2026
58 business days (not counted)
▶ Clock Running
Status: Ready for Scheduling
Feb 16 → Feb 16, 2026
0 business days (counted)
Running total: 1 of 7 biz days used
▶ Clock Running
Status: Assigned
Feb 16 → Feb 17, 2026
1 business day (counted)
Running total: 2 of 7 biz days used
8d
▶ Clock Running
Status: Scheduled
Feb 17 → Feb 27, 2026
8 business days (counted)
Running total: 10 of 7 biz days used
▶ Clock Running
Status: Tech On Site
Feb 27 → Feb 27, 2026
0 business days (counted)
Running total: 10 of 7 biz days used
Created: Nov 17, 2025 Completed: Feb 27, 2026
Business Days Used 10 / 7
0 7d budget +3d over
Show SLA Clock Detail (7 periods)
Period Status Clock Biz Days Running Total
Nov 17 → Nov 17 Created ▶ Running 0 0 / 7
Nov 17 → Nov 18 L2 Screening ▶ Running 1 1 / 7
Nov 18 → Feb 16 Awaiting Parts ⏸ Paused 58
Feb 16 → Feb 16 Ready for Scheduling ▶ Running 0 1 / 7
Feb 16 → Feb 17 Assigned ▶ Running 1 2 / 7
Feb 17 → Feb 27 Scheduled ▶ Running 8 10 / 7
Feb 27 → Feb 27 Tech On Site ▶ Running 0 10 / 7
Dispatch 1.8d
Material Management 59.0d
Coordinators 9.6d
Field Work 0.0d
✗ SLA Missed
Dispatch
1.8 days
Over SLA
Material Management
59.0 days
Over SLA
Coordinators
9.6 days
Over SLA
Field Work
0.0 days
Created: Nov 17, 2025 Due: Feb 23, 2026 (10 days overdue)
📅
72.8 days Total Age
⏱️
59.0d in Awaiting Parts Longest Stage
🔄
7 transitions Status Changes
⚠️
63.9d over Total Delay
📦
2 orders, 0 quotes Parts & Quotes
📝
12 lines Work Details
🏠
1 visit On-Site Trips
👤
Self-Scheduled Scheduling

AI Analysis

Powered by OpenAI
Generating AI analysis...

Originating Case

Open in Salesforce →
🎫
Case #00537817
Needs quote
Closed
Q-00030784 **Unit 1 Follow up to WO-01298656 Inspection #: 29439 Asset ID: 13323892 Model: Junkin - MC-100 Notes: MISSING SHOULDER BOLT (PART OF RELEASE HANGER) NEEDS: (2) MC-100-84 10-24 SHOULDER BOLT. Parts needed for repair 2 shoulder bolts, MC-100-84 **Unit 2 Inspection #: 29439 Asset ID: 13323879 Model: Junkin - MC-100 Notes: LOAD WHEEL ASSEMBLY BENT / DAMAGED; NEEDS: (2) MC-100-78, (4) MC-100-100, (2) MC-100-36, (1) MC-100-101, (1) MC-100-57, (2) STAR WASHER (2) MC-100-68 STANDARD WIDTH ~20\"// Parts needed 1 load wheel, MC-100-78 4 washers, MC-100-100 2 bushings, MC-100-36 1 crosstube, MC-100-101 1 all thread rod, MC-100-57 2 star washers, STAR WASHER 2 acorn nuts, MC-100-68 **Unit 3 Inspection #: 29439 Asset ID: 13323894 Model: Junkin - MC-100 Notes: LOAD WHEEL ASSEMBLY BENT / DAMAGED; NEEDS: (1) MC-100-78, (4) MC-100-100, (2) MC-100-36, (1) MC-100-101, (1) MC-100-57, (2) STAR WASHER (2) MC-100-68 Parts needed 1 load wheel, MC-100-78 4 washers, MC-100-100 2 bushings, MC-100-36 1 crosstube, MC-100-101 1 all thread rod, MC-100-57 2 star washers, STAR WASHER 2 acorn nuts, MC-100-68
Priority
Standard
Origin
Email
Reason
New Case
Contact
Carla Tarrach
Owner
Jessica Sells
Created
Oct 23, 2025
Work Orders from this Case (3)
WO-01315574 Incomplete
Repair • Chris Galasso
Created: Nov 17, 2025
WO-01315575 Invoiced
Repair • Chris Galasso
Created: Nov 17, 2025 • Closed: Feb 27, 2026
WO-01315577 (current) Incomplete
Repair • Chris Galasso
Created: Nov 17, 2025
Behind Schedule - Needs Attention
Incomplete • 107 days old
🚨
Primary Delay 59.0 days stuck in "Awaiting Parts"
⏱️
Total Delay 63.9 business days over SLA thresholds

SLA vs Actual Time by Status

Actual (within SLA)
Actual (over SLA)
SLA Target
Entered
0.0d / 0.5d SLA
L2 Screening
1.8d / 1.0d SLA
Awaiting Parts
59.0d / 3.0d SLA
Ready for Scheduling
0.0d / 1.0d SLA
Assigned
1.0d / 0.5d SLA
Scheduled
8.6d / 2.0d SLA
Completed
0.0d / 1.0d SLA

💬 Activities, Notes & Communications

🔒 Internal CSA Notes

2/27 KWeiss, Created case and sent to sales for quoting.

2/19/26 RBerry- Updated due date based on parts for WO-01315577. Parts delivered on 2/18. Site wants all repairs completed on the same day. Updated delay code to technician unavailable per ASC notes.




2/17 MOwens Carla replied back that 2/27 from 9-5pm works to schedule the repair visit.

2/17 MOwens Sent email back to Carla Tarrach requesting to schedule for the first available date for the tech on 2/27.


Your shipment

1Z01E3E70399094298

Estimated delivery

Tomorrow, February 18, between 12:00 P.M. - 4:00 P.M.


2/10/26 NatoshaB - parts @warehouse for 1 of 2 PO's. Added this to shipping notes since tech not assigned to actual WO: Tech to be assigned is Chris Galasso

🔧 Work Performed
RFQ FOR WHEELS
🔍 Technician Findings
EXISTING LOAD WHEELS CAN NOT BE SAVED DUE TO HOW BADLY BENT ALL THREAD IS
⚠️ Problem Description
Q-00030784 **Unit 3 Inspection #: 29439 Asset ID: 13323894 Model: Junkin - MC-100 Notes: LOAD WHEEL ASSEMBLY BENT / DAMAGED; NEEDS: (1) MC-100-78, (4) MC-100-100, (2) MC-100-36, (1) MC-100-101, (1) MC-100-57, (2) STAR WASHER (2) MC-100-68 Parts needed 1 load wheel, MC-100-78 4 washers, MC-100-100 2 bushings, MC-100-36 1 crosstube, MC-100-101 1 all thread rod, MC-100-57 2 star washers, STAR WASHER 2 acorn nuts, MC-100-68
📄 Description
Junkin MC-100 Manual Cot

Timeline

📞
Case Linked Oct 23, 11:52 AM
Case Number: 00537817
Subject: Needs quote
Status: Closed
🚨 17.0 business days
📋
2 Work Order Created Nov 17, 12:26 PM
Work Order Created → Status: L2 Screening
🔍
Status: L2 Screening by Jessica Sells
From: Entered
To: L2 Screening
Duration in Previous: 3m
📦
2 Parts Requested Nov 18, 10:00 AM
Parts Requested → Status: Awaiting Parts
📦
Status: Awaiting Parts by Keith Weiss
From: L2 Screening
To: Awaiting Parts
Duration in Previous: 21h 30m
🚨 48.0 business days
📦
Parts Requested Jan 29, 1:05 PM
Order: 00089289
Status: Closed
🚨 12.0 business days
📅
Status: Ready for Scheduling by MELISSA BARRETT Feb 16, 1:39 PM
From: Awaiting Parts
To: Ready for Scheduling
Duration in Previous: 90d 3h
👷
2 Technician Assigned Feb 16, 3:48 PM
Technician Assigned → Status: Assigned
👷
Status: Assigned by Melissa Owens
From: Ready for Scheduling
To: Assigned
Duration in Previous: 2h 9m
🔩
2 5x Parts Added Feb 16, 3:58 PM
5x Parts Added → 4x Parts Added
🔩
4x Parts Added
Type: Parts, Expenses
Status: Open
Qty: 1, 4, 2
🗓️
2 Status: Scheduled Feb 17, 1:55 PM
Status: Scheduled → Dispatch Scheduled
📅
Dispatch Scheduled by Melissa Owens
Scheduled For: 2026-02-27T14:30:00.000+0000
⚠️ 9.0 business days
🔧
3 Status: Tech On Site Feb 27, 2:25 PM
Status: Tech On Site → 3x Labor Added → Status: Incomplete
⏱️
3x Labor Added
Type: Labor, Travel
Status: Open
Qty: 0.25, 1, 36
⚠️
Status: Incomplete by Chris Galasso
From: Completed, Tech On Site
To: Incomplete, Completed
Duration in Previous: 3m, 0m

Bottlenecks

L2 Screening
Duration: 1.8 business days (threshold: 1.0 business days)
Exceeded by 6.5 business hours
Awaiting Parts
Duration: 59.0 business days (threshold: 3.0 business days)
Exceeded by 56.0 business days
Assigned
Duration: 1.0 business days (threshold: 4.0 business hours)
Exceeded by 4.0 business hours
Scheduled
Duration: 8.6 business days (threshold: 2.0 business days)
Exceeded by 6.6 business days

🔗 Related Artifacts

📞
Case 00537817
Closed
📦
Parts Order 00085470
Closed
📦
Parts Order 00089289
Closed

ℹ️ Work Order Details

Status
Incomplete
Priority
P7
Type
Repair
Branch
ERLA - PROD
Technician
Chris Galasso
Scheduled
Feb 27, 9:30 AM
Created
Nov 17, 12:26 PM
Invoice #
N/A

Work Details (12)

Name Type Status Qty Amount Date
WL-03107515 Parts Open 1 $0.00 Feb 16, 3:58 PM
WL-03107516 Parts Open 1 $20.25 Feb 16, 3:58 PM
WL-03107517 Parts Open 2 $5.40 Feb 16, 3:58 PM
WL-03107518 Parts Open 2 $0.00 Feb 16, 3:58 PM
WL-03107519 Expenses Open 1 $21.85 Feb 16, 3:58 PM
WL-03107523 Parts Open 1 $36.45 Feb 16, 4:02 PM
WL-03107524 Parts Open 4 $10.80 Feb 16, 4:02 PM
WL-03107525 Parts Open 2 $0.00 Feb 16, 4:02 PM
WL-03107526 Expenses Open 1 $37.59 Feb 16, 4:02 PM
WL-03123578 Labor Open 0.25 $32.50 Feb 27, 2:28 PM
WL-03123579 Labor Open 1 $0.00 Feb 27, 2:28 PM
WL-03123580 Travel Open 36 $0.00 Feb 27, 2:28 PM

Details